Guardian Product Line Tips & Installation Documents

BATTERY > SOLAR > LOAD!
We’ve found that a large number of issues with Guardian board installation/operation can be resolved by removing the three red 10V fuses and re-installing them in the following order:
1. Battery 2. Solar 3. Load. - - This ensures that the system components are receiving power in the safest, most effective order when powering back up.


Need additional help? Call us at 800.782.8721.